PUMP STATION RD over WAIAWA STREAM

365M NW OF WAIHONA PL · County 003, Hawaii · Built 1949 · 2 Lanes · 5 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
1HI0076
Year Built
1949
Length
31.8 m (104.3 ft)
Max Span
13.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
5
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$7,000
Total Project Cost
$90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.