FARR HWY over DBL SECTL PL CULVT-STRM
0.18MI E/LEOKU ST · County 003, Hawaii · Built 1965 · 5 Lanes · 36,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 3 | Serious |
Location
21.379042, -158.020772
This bridge is in worse condition than 98.7% of bridges in County 003. The average bridge in Hawaii is 0 years old; this one is 61 years old.
Nearby Bridges
LEONUI ST. over LEONUI ST/WAIPAHU STRM
Built 1965
LEOKANE ST. over LEOKANE ST/WAIPAHU STRM
Built 1965
WAIPAHU ST over DRAINAGE CANAL #3
Built 1967
FORT WEAVER RD over FARR HWY (S.B.)
Built 1980
FORT WEAVER RD over FARR HWY (N.B.)
Built 1980
HONOWAI ST. over HONOWAI ST/WAIPAHU STRM
Built 1967
FAI-H1 over STRM-TRPL 168"" STL PL
Built 1967
FAI-H1 over AIKI SEP IB (HOAEAE)
Built 1967
FARR HWY over WAIKELE CANAL OB
Built 1963
FAI-H1 over AIKI SEP OB (HOAEAE)
Built 1967
Bridge Details
- Structure #
- 003090001400038
- Year Built
- 1965
- Length
- 8.8 m (28.9 ft)
- Max Span
- 3.7 m
- Width
- 55.3 m (181.4 ft)
- Lanes
- 5
- Daily Traffic
- 36,500
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $550,000
- Total Project Cost
- $550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.