SOUTH ROAD over WAIAKALOA GULCH
TMK 9-6-08:2 · County 001, Hawaii · Built 1935 · 1 Lanes · 200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
19.269156, -155.473756
This bridge is in worse condition than 24.7% of bridges in County 001. The average bridge in Hawaii is 0 years old; this one is 91 years old.
Nearby Bridges
HAWAII BELT ROAD over PANAEWA STREAM
Built 1945
HAWAII BELT ROAD over PANAEWA STREAM
Built 1945
HAWAII BELT ROAD over MAKAKUPU STREAM
Built 2001
HAWAII BELT RD over PIIKEA STRM
Built 1938
HAWAII BELT RD over KAALAALA STRM
Built 2001
HAWAII BELT RD over KEAIWA STRM
Built 2001
HAWAII BELT RD over PAAUAU STRM
Built 2002
HAWAII BELT RD over HIONOMOA STRM
Built 1938
HAWAII BELT RD over MOAULA STRM
Built 1938
MAMALAHOA HWY over MOAULA GULCH
Built 2005
Bridge Details
- Structure #
- 001960001100001
- Year Built
- 1935
- Length
- 6.7 m (22 ft)
- Max Span
- 6.4 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $253,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.