OSHIRO RD over RELIEF OSHIRO RD
1-8-075:001 · County 001, Hawaii · Built 1940 · 2 Lanes · 260 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
19.531011, -155.132231
This bridge is in worse condition than 24.7% of bridges in County 001. The average bridge in Hawaii is 0 years old; this one is 86 years old.
Nearby Bridges
NORTH PECK RD over RELIEF N PECK RD
Built 1940
HAWAII BELT RD over DBL PIPE CLVT(VOLCANO)
Built 1966
HAWAII BELT RD over TPL PIPE CLVT(VOLCANO)
Built 1966
HAWAII BELT RD over DBL PIPE CLVT(VOLCANO)
Built 1966
SOUTH KULANI ROAD over RELIEF SOUTH KULANI ROAD
Built 1969
BYPASS (RT.130) over UNNAMED STREAM
Built 1999
KEEAU-PAHOA HWY over WAIPAHOEHOE STRM
Built 1968
HOAKA RD over WAIAKEA STRM
Built 1970
Keaau-Pahoa Bypass over Unknown Stream
Built 2004
Keeau-Pahoa Road over Unknown Stream
Built 2004
Bridge Details
- Structure #
- 001180001100004
- Year Built
- 1940
- Reconstructed
- 2003
- Length
- 11.9 m (39 ft)
- Max Span
- 10.5 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 260
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.