FS-42 over TRIB CANOOCHEE RIVER

TAC-X ENTR. ROADWAY · County 029, Georgia · Built 2011 · 2 Lanes · 500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
DAPFORSTE0BRG77
Year Built
2011
Length
6.7 m (22 ft)
Max Span
1.8 m
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.