FS-13 over CANOOCHEE CREEK

2345 4960 · County 109, Georgia · Built 1993 · 1 Lanes · 500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
DAPFORSTE000013
Year Built
1993
Length
21.3 m (69.9 ft)
Max Span
4.3 m
Width
7.2 m (23.6 ft)
Lanes
1
Daily Traffic
500
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.