STORY RD. over MILL CREEK

APP 5 MI SW OF DOLES · County 321, Georgia · Built 1991 · 2 Lanes · 194 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000032150020
Year Built
1991
Length
36.6 m (120.1 ft)
Max Span
4.6 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
194
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.