US 82 COR Z/ SR 52 over WARRIOR CREEK TRIB.

0.7 MI E OF POULAN · County 321, Georgia · Built 1952 · 4 Lanes · 15,300 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000032100200
Year Built
1952
Reconstructed
1982
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
4
Daily Traffic
15,300
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$193,000
Total Project Cost
$290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.