US 82 COR Z (WBL)/ over CSX RAILROAD (REMOVED)

0.5 MI E OF POULAN · County 321, Georgia · Built 1982 · 2 Lanes · 16,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000032100190
Year Built
1982
Length
43 m (141.1 ft)
Max Span
14.3 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
16,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$551,000
Total Project Cost
$826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.