SANDTOWN ROAD over FISHING CREEK

3.3 MI NW OF METASVILLE · County 317, Georgia · Built 2018 · 2 Lanes · 280 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000031750500
Year Built
2018
Length
76.2 m (250 ft)
Max Span
15.2 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
280
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$22,200,000
Total Project Cost
$33,300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.