MT OLIVET CHURCH R over JOINER CREEK

8 MI W OF ALAMO · County 309, Georgia · Built 2020 · 2 Lanes · 380 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000030950370
Year Built
2020
Length
36.6 m (120.1 ft)
Max Span
6.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
380
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$10,656,000
Total Project Cost
$15,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.