SPRING HILL CH RD over ALLIGATOR CREEK
11 MI S OF GLENWOOD · County 309, Georgia · Built 2017 · 2 Lanes · 90 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
32.023869, -82.691933
This bridge is in worse condition than 62.3% of bridges in County 309. The average bridge in Georgia is 0 years old; this one is 9 years old.
Nearby Bridges
CR 174 over EDWARDS CREEK
Built 1993
OLD SAND PIT ROAD over LITTLE OCMULGEE RIVER
Built 1968
CEDAR PARK TOWNS R over LITTLE OCMULGEE RIVER
Built 1953
CR 173 over ALLIGATOR CREEK
Built 1965
HOPE CHURCH ROAD over EDWARDS CREEK
Built 1960
CAMP CREEK ROAD over CAMP CREEK
Built 1988
OLD SAND PIT ROAD over SUGAR CREEK
Built 1968
US 23 EBL over SUGAR CREEK
Built 1999
US 23 WBL over SUGAR CREEK
Built 1951
DAVIS CHAPEL CHURC over OCMULGEE RIVER TRIB
Built 1988
Bridge Details
- Structure #
- 000000030950350
- Year Built
- 2017
- Length
- 73.2 m (240.2 ft)
- Max Span
- 18.3 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 90
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $21,312,000
- Total Project Cost
- $31,968,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.