MILLARD KENNEDY RD over BEAR CREEK

5 MI SW OF PRESTON · County 307, Georgia · Built 1968 · 2 Lanes · 60 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000030750060
Year Built
1968
Length
29.3 m (96.1 ft)
Max Span
9.8 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
60
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$375,000
Total Project Cost
$563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.