US 280 over HOG BRANCH

3.5 MI E OF PRESTON · County 307, Georgia · Built 1995 · 2 Lanes · 2,620 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000030700210
Year Built
1995
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,620
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.