HOLMESVILLE ROAD over BOGGY CREEK

3.5 MI S OF ODUM · County 305, Georgia · Built 2017 · 2 Lanes · 440 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000030550600
Year Built
2017
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
440
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,328,000
Total Project Cost
$7,992,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.