US 25 (EBL) over GARDI BRANCH

0.5 MI NW OF GARDI · County 305, Georgia · Built 2000 · 2 Lanes · 6,770 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000030550430
Year Built
2000
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
6,770
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.