SR 88 (WBL) over OGEECHEE RIVER OVERFLOW

4.4 MI N OF DAVISBORO · County 303, Georgia · Built 2003 · 2 Lanes · 5,240 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000030350560
Year Built
2003
Length
80.2 m (263.1 ft)
Max Span
16.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
5,240
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,028,000
Total Project Cost
$1,541,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.