SR 272 over BUFFALO CREEK OVERFLOW

2.6 MI N OF OCONEE · County 303, Georgia · Built 1961 · 2 Lanes · 450 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000030300260
Year Built
1961
Length
78 m (255.9 ft)
Max Span
9.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
450
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.