CAMP BR CH ROAD over GREASY BRANCH

15.5 MI S OF WAYCROSS · County 299, Georgia · Built 2020 · 2 Lanes · 110 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000029951140
Year Built
2020
Length
21.3 m (69.9 ft)
Max Span
21.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
110
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$6,216,000
Total Project Cost
$9,324,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.