US 82 (EBL) COR Z over CSX RAILROAD 908585W

4 MI W OF WAYCROSS · County 299, Georgia · Built 1984 · 2 Lanes · 11,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029900720
Year Built
1984
Length
53.9 m (176.8 ft)
Max Span
20.4 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
11,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$692,000
Total Project Cost
$1,037,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.