US 82 COR Z over FULLWOOD CREEK TRIB

9.5 MI W OF WAYCROSS · County 299, Georgia · Built 1932 · 4 Lanes · 4,110 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000029900150
Year Built
1932
Reconstructed
1988
Length
7.3 m (24 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
4,110
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$145,000
Total Project Cost
$217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.