MT CARMEL CH ROAD over TURKEY CREEK

4.5 MI NE OF GOOD HOPE · County 297, Georgia · Built 2014 · 2 Lanes · 323 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000029750940
Year Built
2014
Length
31.4 m (103 ft)
Max Span
31.4 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
323
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$290,856,000
Total Project Cost
$436,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.