COUNTY LINE ROAD over ALCOVY RIVER

3 MI W OF SOCIAL CIRCLE · County 297, Georgia · Built 1995 · 2 Lanes · 320 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000029750790
Year Built
1995
Length
85.3 m (279.9 ft)
Max Span
24.4 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
320
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,094,000
Total Project Cost
$1,641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.