US 78 EBL / SR 10 over ALCOVY RIVER

3 MI E OF BETWEEN · County 297, Georgia · Built 1950 · 2 Lanes · 24,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000029700020
Year Built
1950
Length
68.9 m (226 ft)
Max Span
15.2 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
24,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$883,000
Total Project Cost
$1,325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.