TRION ROAD over CANE CREEK OVERFLOW

5.6 MI S OF LAFAYETTE · County 295, Georgia · Built 1922 · 2 Lanes · 410 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000029550120
Year Built
1922
Reconstructed
1980
Length
29.3 m (96.1 ft)
Max Span
7.3 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
410
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$375,000
Total Project Cost
$563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.