SALEM ROAD over DRY CREEK

JUST WEST OF ROSSVILLE · County 295, Georgia · Built 1930 · 2 Lanes · 320 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000029500400
Year Built
1930
Reconstructed
1952
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
320
Material
Concrete
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.