MCCRARY ROAD over MACK WOODALL BRANCH

11 MI NW OF THOMASTON · County 293, Georgia · Built 2023 · 2 Lanes · 350 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000029350650
Year Built
2023
Length
7.6 m (24.9 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
350
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.