US 19/ SR 3 over POTATO CREEK

IN THOMASTON · County 293, Georgia · Built 2013 · 5 Lanes · 21,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029350630
Year Built
2013
Length
105.2 m (345.1 ft)
Max Span
38.4 m
Width
26.4 m (86.6 ft)
Lanes
5
Daily Traffic
21,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.