MUD BRIDGE ROAD over POTATO CREEK

3 MI NW OF THE ROCK · County 293, Georgia · Built 1979 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029350320
Year Built
1979
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000