SR 36 over POTATO CREEK

3 MI W OF THOMASTON · County 293, Georgia · Built 1991 · 2 Lanes · 2,290 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029300330
Year Built
1991
Length
86 m (282.2 ft)
Max Span
23.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,290
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,102,000
Total Project Cost
$1,653,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.