SR 74 over TOBLER CREEK

1.5 MI W OF YATESVILLE · County 293, Georgia · Built 1936 · 2 Lanes · 2,490 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000029300170
Year Built
1936
Reconstructed
1944
Length
54.3 m (178.1 ft)
Max Span
13.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
2,490
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$695,000
Total Project Cost
$1,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.