SPIVA COVE ROAD over NOTTELY RIVER

10.3 MI SE OF BLAIRSVILLE · County 291, Georgia · Built 1980 · 1 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000029150450
Year Built
1980
Length
18.3 m (60 ft)
Max Span
9.1 m
Width
3.2 m (10.5 ft)
Lanes
1
Daily Traffic
100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$170,000
Total Project Cost
$256,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.