JOHN SMITH ROAD over NOTTELY RIVER

10.4 MI NW OF BLAIRSVILLE · County 291, Georgia · Built 1985 · 2 Lanes · 323 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000029150350
Year Built
1985
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
323
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000
Total Project Cost
$938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.