US 19- US 129 over NOTTLEY RIVER

5.8 MI S OF BLAIRSVILLE · County 291, Georgia · Built 1980 · 2 Lanes · 5,790 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029100080
Year Built
1980
Length
62.2 m (204.1 ft)
Max Span
20.7 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
5,790
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$797,000
Total Project Cost
$1,196,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.