SR 112 over BIG BRANCH

6 MI SW OF SYCAMORE · County 287, Georgia · Built 2002 · 2 Lanes · 1,153 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028750430
Year Built
2002
Length
36.3 m (119.1 ft)
Max Span
12.2 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
1,153
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$465,000
Total Project Cost
$697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.