CARTER ROAD over HAT CREEK

5.8 MI SE OF SYCAMORE · County 287, Georgia · Built 1974 · 2 Lanes · 170 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028750100
Year Built
1974
Reconstructed
2001
Length
43.6 m (143 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
170
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$559,000
Total Project Cost
$838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.