SR 32 over SR401(EXIT 78) @ 078.28N

1.6 MI SE OF SYCAMORE · County 287, Georgia · Built 1958 · 2 Lanes · 1,240 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028700090
Year Built
1958
Length
90.2 m (295.9 ft)
Max Span
24.7 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,240
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,141,000
Total Project Cost
$1,711,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.