HUNT ROAD over MUD CREEK
3 MI SE OF LAGRANGE · County 285, Georgia · Built 2018 · 2 Lanes · 350 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
32.962281, -84.989967
This bridge is in worse condition than 20.8% of bridges in County 285. The average bridge in Georgia is 0 years old; this one is 8 years old.
Nearby Bridges
US 27/ SR 1 over MUD CREEK
Built 1949
ROBERTSON ROAD over MUD CREEK
Built 1970
US 27 (NBL)/ SR 1 over I-185 (SR 411)
Built 1977
US 27 (SBL)/ SR 1 over I-185 (SR 411)
Built 1977
SR 219 over LONG CANE CREEK
Built 1992
US 27/ SR 1 over LONG CANE CREEK
Built 2023
VULCAN MATERIAL RD over PANTHER CREEK
Built 1970
LOWER BIG SPRINGS over I-185 SBL (SR 411)
Built 1977
LOWER BIG SPRINGS over I-185 NBL (SR 411)
Built 1977
I-85 (NBL) over SR 1 (US 27)
Built 1977
Bridge Details
- Structure #
- 000000028550830
- Year Built
- 2018
- Length
- 20.8 m (68.2 ft)
- Max Span
- 20.7 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 350
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,068,000
- Total Project Cost
- $9,102,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.