US 27 (NBL)/ SR 1 over WEST POINT LAKE TRIB

9.8 MI N OF LAGRANGE · County 285, Georgia · Built 2003 · 2 Lanes · 5,380 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000028550610
Year Built
2003
Length
24.4 m (80.1 ft)
Max Span
24.4 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
5,380
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.