MIDWAY CHURCH ROAD over I-16 (SR 404)

3 MI N OF SOPERTON · County 283, Georgia · Built 1974 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028300220
Year Built
1974
Length
78.9 m (258.9 ft)
Max Span
32 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,012,000
Total Project Cost
$1,518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.