SR 56 over OHOOPEE RIVER

11 MI NE OF SOPERTON · County 283, Georgia · Built 1988 · 2 Lanes · 1,190 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028300210
Year Built
1988
Length
121.9 m (399.9 ft)
Max Span
18.3 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,190
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,563,000
Total Project Cost
$2,344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.