SR 66 over BRASSTOWN CREEK

3.2 MI NW OF YOUNG HARRIS · County 281, Georgia · Built 2017 · 2 Lanes · 2,259 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000028150360
Year Built
2017
Length
54.9 m (180.1 ft)
Max Span
27.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,259
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,984,000
Total Project Cost
$23,976,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.