US 76 SR 2 over HIAWASSEE RIVER

2 MI SE OF HIAWASSEE · County 281, Georgia · Built 1940 · 2 Lanes · 11,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000028100050
Year Built
1940
Reconstructed
1990
Length
70.1 m (230 ft)
Max Span
14 m
Width
18.1 m (59.4 ft)
Lanes
2
Daily Traffic
11,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$899,000
Total Project Cost
$1,348,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.