LYONS-NORMANTOWN R over TIGER CREEK

4.5 MI NW OF LYONS · County 279, Georgia · Built 1969 · 2 Lanes · 519 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000027950150
Year Built
1969
Reconstructed
2001
Length
103.6 m (339.9 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
519
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,328,000
Total Project Cost
$1,993,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.