US 1- SR 4 over BRANCH OF SWIFT CREEK

N SECTION OF LYONS GA · County 279, Georgia · Built 1928 · 2 Lanes · 6,010 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000027900080
Year Built
1928
Reconstructed
1964
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
6,010
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$125,000
Total Project Cost
$188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.