WHITNEY CAMP RD over AUCILLA RIVER OVERFLOW

APP 3.5 MI S OF BOSTON · County 275, Georgia · Built 2001 · 2 Lanes · 158 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027551360
Year Built
2001
Length
12.2 m (40 ft)
Max Span
6.1 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
158
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$234,000