STAGE ROAD over OAKY WOODS CREEK

4.5 MILES SOUTHEAST OF ME · County 275, Georgia · Built 1996 · 2 Lanes · 240 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027551240
Year Built
1996
Length
32 m (105 ft)
Max Span
10.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
240
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$410,000
Total Project Cost
$615,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.