KENNEDY POND ROAD over CHENUBEE CREEK

2 MILES SOUTHEAST OF PARR · County 273, Georgia · Built 2018 · 2 Lanes · 90 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000027350360
Year Built
2018
Length
17.7 m (58.1 ft)
Max Span
17.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
90
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,150,000
Total Project Cost
$7,725,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.