HORSESHOE ROAD over PINE HEAD CREEK

4 MI SW OF PARROTT · County 273, Georgia · Built 1950 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000027350050
Year Built
1950
Length
14.6 m (47.9 ft)
Max Span
4.9 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
158
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$50,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.