NEILY WAGON RD over SUGAR CREEK
2.5 MI W OF TOWNS · County 271, Georgia · Built 1978 · 2 Lanes · 158 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.981192, -82.780808
This bridge is in worse condition than 47.9% of bridges in County 271. The average bridge in Georgia is 0 years old; this one is 48 years old.
Nearby Bridges
CEDAR PARK TOWNS R over LITTLE OCMULGEE RIVER
Built 1953
US 23/ SR 27 over CATTLE CROSSING BRANCH
Built 1934
SUGAR CREEK ROAD over SUGAR CREEK
Built 1960
POWELL SCHOOL ROAD over TURNPIKE CREEK
Built 1960
US 23 EBL over SUGAR CREEK
Built 1999
US 23 WBL over SUGAR CREEK
Built 1951
OLD SAND PIT ROAD over LITTLE OCMULGEE RIVER
Built 1968
OLD SAND PIT ROAD over SUGAR CREEK
Built 1968
SR 149 over TURNPIKE CREEK
Built 2001
CR 174 over EDWARDS CREEK
Built 1993
Bridge Details
- Structure #
- 000000027150150
- Year Built
- 1978
- Reconstructed
- 2002
- Length
- 67.1 m (220.1 ft)
- Max Span
- 6.1 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 158
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $860,000
- Total Project Cost
- $1,289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.